Live
- Polling concludes in Maharashtra and Jharkhand Assembly elections
- Chhattisgarh CM Sai briefs HM Amit Shah on progress in Maoist-affected areas
- Bengal PDS case: ED seeks report on medical conditions of jailed former minister
- Siddharth's Romantic Drama Miss You Set to Hit Theaters on November 29
- India’s 1st AI data bank to boost national security launched
- Humbled to receive 'Key to the City of Georgetown', says PM Modi in Guyana
- 11 lakh BPL cards revoked, claims K’taka BJP
- Exit polls results indicated victory of the NDA government in Maharashtra and Jharkhand!
- Deputy CM Bhatti Vikramarka Reviews SC/ST Development Funds Implementation
- AP cabinet approves key decisions, check here
Just In
Rohtang highway tunnel to prove a blessing for T-90 tanks too
One of the world's most challenging and a marvel of engineering motorways -- the Rohtang Pass highway tunnel -- in the Himalayas is strategic as it will bring the Indian Army with its T-90 tanks and infantry combat vehicles closer to the Line of Actual Control, project engineers said on Friday
One of the world's most challenging and a marvel of engineering motorways -- the Rohtang Pass highway tunnel -- in the Himalayas is strategic as it will bring the Indian Army with its T-90 tanks and infantry combat vehicles closer to the Line of Actual Control, project engineers said on Friday.
It is all set to be inaugurated by Prime Minister Narendra Modi on October 3.
The 9.2 km-long horseshoe-shaped single-tube, two-lane tunnel -- the world's longest motorable tunnel at over 3,000 metre above the sea level, coming up under the 3,978 metre Rohtang Pass in the Pir Panjal range some 30 km from here in Himachal Pradesh.
"The all-weather tunnel can take any military traffic, even armoured vehicles," an official aware of the development told IANS.
However, the all-weather road to forward areas of Ladakh requires more tunnels, either at Shikunla or at the high passes located on the 475-km Manali-Leh road for round-the-year connectivity.
Considered a wonder of human perseverance, the Rohtang tunnel, a dream of former Prime Minister Atal Bihari Vajpayee and named after him posthumously, is going to be completed after 10 years of sheer hard work by the Border Roads Organisation (BRO) with an outlay of Rs 4,000 crore.
Talking exclusively to IANS, project Director Colonel Parikshit Mehra said the tunnel has manoeuvred one of the largest shear zones in the history of highway tunneling.
"A length of 587 m across the Seri-nullah or rivulet zone took us four years and the balance 8.4 km took almost the same time," he said.
Mehra, who did twin master's degree in tunneling, including the one from Austria, said during excavation the temperature inside the tunnel rose to 55 degrees Celsius before breakthrough and it hardly crossed 20 degrees after that.
On its vulnerability, he said, "The deep tunnels in general are not vulnerable to tectonic effects since they move as a rigid body with shock waves.
"However portal buildings are vulnerable to earthquakes and in our case earthquake loads have been considered in design."
On the decision to keep the main and escape tunnel within the same opening was with a viewpoint not to disturb a large extent of rock mass and restrict excavation to a specific area only, Colonel Mehra said.
Globally, the escape tunnel is built separately along the main tunnel.
And no wonder the working conditions were relatively short and tough too owing to climatic conditions. "The north portal of the tunnel was accessible only for five-six months in a year,' he said.
The tunnel construction, a blessing for the people of landlocked Lahaul-Spiti district who mark a new beginning in their lives this winter, was abandoned on numerous occasions, primarily due to the complex geology that included fracture zones and fault lines.
Colonel Mehra said all major works have been completed. Now cleaning and final touches are going on inside the tunnel.
He said for at least two years the BRO would regulate the movement of vehicles through the tunnel. Later, it would be handed over to the local civil authorities.
The tunnel will shorten the distance between this Himachal Pradesh tourist resort and Keylong, the headquarters of Lahaul-Spiti, by 46 km, shortening the travel time by nearly three hours.
With the maximum speed limit of 80 km per hour, the tunnel is expected to see traffic of 3,000 cars and 1,500 trucks a day.
The tunnel has consumed 12,252 metric tonnes of steel, 1,69,426 metric tonnes of cement and 1,01,336 metric tonnes of concrete, and excavated out 5,05,264 metric tonnes of soil and rocks by adopting the latest Austrian tunnelling method for construction.
The construction contract of the tunnel has been awarded to Strabag-Afcons, a joint venture between India-based Afcons Infrastructure and Austria's Strabag.
Chandigarh-based Snow and Avalanche Study Establishment (SASE) has designed mechanical structures to ensure the safety of motorists by countering avalanches on both ends of the tunnel that remain under snow even during peak summer.
Engineers of SASE, a Defence Research and Development Organisation (DRDO) laboratory, said self-escape snow galleries have been erected for the safety of motorists after studying the local dynamics of avalanches like force and velocity.
The tunnel's foundation stone was laid by United Progressive Alliance (UPA) Chairperson Sonia Gandhi on June 28, 2010, in the Solang Valley near Manali, some 570 km from the national capital.
The completion of the Atal tunnel is a key element in the Defence Ministry's attempts to make the entire 475 km-long Manali-Keylong-Leh highway, used by the armed forces to reach forward areas in Ladakh bordering China and Pakistan, motorable almost round the year.
© 2024 Hyderabad Media House Limited/The Hans India. All rights reserved. Powered by hocalwire.com