Inspection team arrives at railway station

Inspection team arrives at railway station
x
Highlights

As per the directions of Chief general manager Vinod Kumar Yadav, a high-level technical team consisting of Shailendra Singh (ADRM), chief engineer Ramesh Reddy, Durgaprasad and other consultants along with BJP MLA N V S S Prabhakar inspected and studied the pathetic conditions and situation at Moulali railway station. Recently Uppal MLA N V S S Prabhakar met General Manager, Railways and represen

Uppal: As per the directions of Chief general manager Vinod Kumar Yadav, a high-level technical team consisting of Shailendra Singh (ADRM), chief engineer Ramesh Reddy, Durgaprasad and other consultants along with BJP MLA N V S S Prabhakar inspected and studied the pathetic conditions and situation at Moulali railway station. Recently Uppal MLA N V S S Prabhakar met General Manager, Railways and represented to develop the Moula ali station.

On the direction of CGM team studied the situation for two hours and agreed to take up foot over bridge connecting platforms with Rs two crores on a warfooting and also agreed to provide passenger amenities like platform shelters, water supply, toilets, chairs, drainage, waiting hall and lighting facility with Rs 2 crores.

The team also recommended the approach road connectivity between Nacharam and Lalapet by providing ROB at level crossing with 65 crores in consultation with state government.

Speaking to the team and locals, BJP MLA Prabhakar said stopping of more trains is also required for reducing the traffic congestion at Secunderabad railway station. This station development will be more useful for the public and to the industries also.

Show Full Article
Print Article
Next Story
More Stories
ADVERTISEMENT
ADVERTISEMENTS