Complete Bhagiratha works by August 15

Update: 2018-08-07 05:30 IST

Suryapet: Chief Minister Office Special Officer Smitha Sabarwal has instructed engineers and contract agency staff of GVPR to complete the Mission Bagiratha works as per schedule to provide clean drinking water to every household in the district. 

On Monday, along with District Collector K. Surendramohan she examined the works at Immampet and Undragonda of Suarypet constituency.
Smitha Sabarwal advised officials to put in all efforts to complete the tasks in time to provide water by August 15 as per the directions of Chief Minister K Chandrasekhar Rao. 

She advised officials and contract agency to carry out the supply and internal works simultaneously and engage more technical staff and laborers to finish the works as early as possible.

After examining the water purification and pump house works at Immampet , she inspected the reservoir and pipeline works at Undragonda hillock.Suryapet JC Sanjeeva Reddy , Mission Bagirtha CE Vijay Prakash, SE Madhu Babu, EE Venkateshwarlu, DE Naresh, GVPR engineering staff were present on the occasion.

Tags:    

Similar News